PECK CONSTRUCTION INC. -
Current Projects
 
 
Querbes Lift Station Improvements
 
$2,690,000.00
 
Description:
Renovation of a sewer lift station in Shreveport, LA.
Three new 250 HP dry pit pumps, 24" header piping & valves, building renovations, and odor control system
 
Owner:
City of Shreveport, LA
 
Engineer: 
Balar Engineers
Ben Rauschenbach
(318) 221-8312
 
 
Sewer System Improvements for DG Foods
 
$1,273,600.00
 
Description:
A new pre-treatment facility for wastewater from the DG Foods processing plant in Bastrop, LA.
 
Owner: 
DG Foods
 
Engineer: 
Denmon Engineering
Chris Patrick
(318) 388-1422
 
 
Water System Improvements
 
$142,545
 
Description:
A new 250 HP vertical turbine pump at a raw water pump station.
 
Owner: 
City of Natchitoches, LA
 
Engineer: 
Nassif Engineering & Architecture
Norman Nassif
(318) 527-4409